Skip to content

control.io is an independent construction-supervision service that flies drones over multistorey building sites, reconstructs each flight as a 3D model, compares it with the official construction schedule, and issues evidence-grade PDF reports that show whether, where and by how much a project is late.

Last updated

Why we exist

On most multistorey projects, the only detailed account of progress comes from the party doing the work. Buyers, lenders and city offices read that account and decide whether to pay, extend or intervene, usually without a way to check it.

control.io was started to give those readers an independent measurement. We fly the site, rebuild it in 3D, read the schedule the developer committed to and report the difference, with every image hashed and every date traced back to its source page.

The same method, a repeatable flight plus classified findings pinned to a map, also applies to solar plants, where thermal drones find faulty modules across very large arrays.

Drone orbit of a six-storey tower from the north-east

Principles

  • 01

    We are not the contractor and not the developer. Our pilots, our processing and our reports answer to the evidence, which is why lenders and municipalities can rely on them.

  • 02

    Original images are kept, hashed and linked to the schedule page they test. Anyone can re-open a finding and see exactly what it rests on.

  • 03

    A delay found in month three can still be recovered. Regular flights and automatic comparison surface slippage while there is time to act on it.

control.io Field Engineering Team

Civil engineers, licensed drone pilots and photogrammetry specialists who run control.io's site supervision and inspection flights. The team is based in Yerevan, Armenia and works with certified local pilots wherever our customers build.

One site, one month, one evidence-grade report.

We fly

A certified pilot flies your site on a saved route within your first month.

We compare

Your schedule is read, cited and compared with the 3D model, floor by floor.

You decide

A PDF delay report with hashed evidence lands in your inbox and dashboard.